Friday, October 30, 2009


CIT goes into the Medical business.

Starting this month CIT has been awarded a multi year contract from DJO to produce Medical Therapy tables. We have renovated one of our original facilities into the CIT Medical assembly facility. We will be producing 11 different therapy tables, about 6000 tables per year, to current FDA specifications. What does this mean for you, it means that we are again moving our quality to the next level. We are currently ISO 9001:2008 certified and next year will include ISO 13485 certification. Some of the components we will be importing, some of the components we will be manufacturing and we will be doing 100% of the assembly. Additionally we are adding about 20 new jobs to handle this exciting new line for us. As you can see, we are constantly thinking outside the box, give us the opportunity to work with you on your next project.

Wednesday, August 26, 2009

CIT Adds Another Robotic Welder






CIT has added our 4th robotic welder. The latest robot is table mounted next to double 5' x 8' tables. The robot can move from one table to the next so that one side can be set up while the other side is unloaded. Once again CIT designed and built this robot in-house. By adding this 4th robot we have increased our capacity by over 50% without adding any additional overhead. This is the way that we look at all of our projects, do it the most efficient way possible to save the customer time and money.




Thursday, July 2, 2009

Announcing the C-I-T FloorLock corner post

The C-I-T FloorLock corner post is a revolutionary idea in safety for caster racks.


Current issues for caster racks include:






  • At least (2) casters per rack should have brakes




  • Someone has to remember to set those brakes when they are stacked in your warehouse loaded or empty.




  • Someone has to remember to set the brakes when they are stacked and loaded into the truck for shipment, with your valuable parts in them.




  • When the brakes aren't set on stacked racks in your warehouse, your employees are at risk.




  • When the brakes aren't set on the racks stacked in a truck for shipment, your parts are at risk.


With the C-I-T FloorLock corner post you don't have any of these issues. Stack them up in your warehouse or your shipping truck and forget them, the FloorLock corner post remembers to be safe for you.




Call us Toll Free @866-439-1493 ext. 227 and ask how the C-I-T FloorLock corner post may work for you or email us for more information through this website.

Tuesday, June 23, 2009




The Ultimate "Green" Product






C-I-T re-usable steel shipping racks and containers are the ultimate "green" shipping solution. From our painting process which uses a high pressure wash system with no harsh chemicals and water based paint (no solvents) to our environmental management process system of recycling all unused steel, we are constantly thinking about how we can help our enviroment while saving you money. We order all of our water soluble paint in a batch process by job for total utilization. C-I-T also recycles all scrap/un-used steel that goes into the racks as well as any steel or plastic from racks that we have modified. With C-I-T re-usable racks and containers you don't have any disposal costs as you do with wood and cardboard products plus you get years of service from each one. Even when your product changes, we can design new components so that your current racks can be modified. Send us an email or give us a call, we want to be your "packaging" solution.

Wednesday, June 3, 2009

Updated news page








This is the latest, updated, June 2009 model CIT news page. As we move forward we will be adding new infromation to this page at least weekly so keep coming back to see what is new. We would also like for you to give us your feedback on what you think of our topics, presentation, website in general and CIT as it pertains to any projects that you may have going on with us. As a side note our latest newsletter will be going out this week so please look for it in your mailbox.






The latest news is that CIT was just re-certified as ISO 9001:2008 so we are up to date with the latest ISO requirements to exceed your needs.






Give us an opportunity to show you how we do business, from concept through prototype, to first off to your production run, we can handle it from beginning to end.

One Company - One Source

Monday, May 4, 2009

CIT Announces The Birth Of Our Latest Robotic Welder

Standing at 144” tall and over 8000 lbs., our latest robotic welder is a site to behold. CIT designed and built our latest piece of equipment IN HOUSE, utilizing our design and tool shop capabilities. Our latest robot improves our welding capabilities by being faster, more efficient and makes the same great weld each and every time.

Give us an opportunity to show you the kind of value we can bring to your programs by letting us quote your next project; I think you will be surprised at how competitive we are. CIT continues to build on our “One Company – One Source” philosophy.